Wind turbine producer in a tight production pinch ends up saving over $2.6 million in transportation costs – PLG Consulting Wind turbine producer in a tight production pinch ends up saving over $2.6 million in transportation costs – PLG Consulting

Wind turbine producer in a tight production pinch ends up saving over $2.6 million in transportation costs


Warning: Undefined variable $post in /home/customer/www/plgconsulting.com/public_html/wp-content/themes/porto/single-portfolio.php on line 29

Warning: Attempt to read property "ID" on null in /home/customer/www/plgconsulting.com/public_html/wp-content/themes/porto/single-portfolio.php on line 29

Wind turbine producer in a tight production pinch ends up saving over $2.6 million in transportation costs


Portfolio Description
  • 0
  • October 11, 2018

When their Spanish business unit announced a production shortfall and thus inability to fulfill existing customer order of over 600 wind turbine blades, this client turned to PLG Consulting for help.